Rooflights: falls, sizes and what goes wrong

Overhead glazing needs a minimum 5 degree fall. Below that, water sits, dirt bonds to the glass and the seal works harder than it was designed to. A frameless rooflight goes to 2500 x 4000 mm at Uw 1.0, and every unit is laminated on the inner pane to BS 5516-2 because it is glass above your head.

Decision

Which applies to you

  1. A flat roof on an extension

    Frameless rooflight on a builder's upstand, built to a 5 degree fall. The upstand is the part that leaks if it is wrong: we issue the setting-out drawing and the builder forms it before we survey.

  2. You want the largest possible single pane

    2500 x 4000 mm frameless, Uw 1.0. Beyond that it is a lantern or a feature assembly with a structural member, because the glass weight and the crane access stop being sensible.

  3. A pitched roof

    Skylights, set into the rafters. Different product, different flashing, and it follows the existing pitch rather than needing a fall built for it.

  4. A kitchen or a room you cool in summer

    Specify solar control glass. Overhead glazing gains far more heat than a vertical window of the same area; this is the single most common regret and it is a glass choice, not a frame choice.

Evidence

The figures behind it

Minimum fall
5 degrees
Maximum frameless pane
2500 x 4000 mm
Uw
From 1.0 W/m2K
Overhead glazing standard
BS 5516-2, laminated inner pane
Upstand
Formed by the builder before survey, to our setting-out drawing
Related

Products this points at

Proof

Projects that used these products

Questions

Also asked

Can I have a completely flat rooflight?
No. The minimum is 5 degrees and we will not supply below it. A dead-flat unit ponds, stains within a season and voids the seal guarantee.
Who builds the upstand?
Your builder, to our drawing, before we survey. We survey the finished upstand and manufacture to what is actually there, which is why the sequence matters.
Will it leak?
Not at the glass. Overhead glazing that leaks almost always leaks at the upstand or the roof membrane dressing, which is why we survey after the upstand is built rather than before.